Place of Origin: | China |
---|---|
Brand Name: | Ruicheng |
Model Number: | Aluminum Curtain Track Profile-003 |
Price: | To Be Negotiated |
Packaging Details: | carton/poly bag/shrink film/pallet/customized |
Delivery Time: | 15-20 work days |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability: | 100000 pieces per month |
Name: | Aluminum Curtain Track | Thickness: | 0.3mm-3mm Or Customized |
---|---|---|---|
Color: | Customized | Height: | 7-8.5mm Or Custiomized |
Size: | Accept Customized | Temper: | T3-T8 |
Grade: | Aluminum Alloy 6063, 6061 | Application: | Rail Poles, Curtain Track |
High Light: | 6061 Aluminium Curtain Rail Track,T3 Aluminium Curtain Rail Track,Antioxidation white aluminium curtain track |
Double Customized Aluminum Profile For Curtain Rail Track And Rods
Application
Aluminum Profile Curtain Track is the most popular material in the market, because it is cheap, durable, not easy to rust and so on. With the development of modern technology, aluminum alloy can also have a variety of colors and styles. At the time of purchase, the wall thickness of aluminum alloy and its own weight are very key reference factors.
Most of the dark rails in the home decoration market are made of aluminum alloy. The aluminum alloy used as the curtain track is generally oxidized. Even if the curtain track is used for a long time, it will not be broken and aged due to oxidation. Moreover, the price of aluminum alloy is not very high, so more people use it.
A curtain slide is the core part of the curtain truck, which is an essential item of the curtain. High quality curtain slide can ensure that the curtain is more convenient and worry free in the process of use. The smooth opening and closing of curtain depends on the quality of curtain truck.
Feature
Specification
Material | Mainly aluminum alloy 6063, 6061 |
Temper | T3-T8 |
Surface Treatment | Mill Finish Powder coating Anodized Electrophoresis Sand- blasting fluorocarbon coating Wood grain |
Color | Customer required |
Length | Customer required |
Production Capacity | 20000 tons/year |
Delivery | 20-25 days per 40FT container After confirmation of the order |
Payment terms | T/T, L/C, 30% advanced deposit, the balance paid off at Sight |